POWERING PROGRESS with expert solutions in transmission, generation, and distribution.

Major Power Transmission Projects > ECTP Project

Client:

ENMAX Power Corporation

Budget:

$84M

Location:

Calgary, AB

Project:

ECTP Project

Senior Project Manager

Project Manage the planning, NID assistance, NID, SP, and execution of the ECTP Project consisting of:

  • ENMAX No. 25 Substation: A new four diameter breaker and a half, 240kV switchyard to connect Shepard Energy Center (880MW) to the transmission system. Substation

    consisted of three generator infeeds and four 240kV U/G Transmission lines.

  • ENMAX No. 2 Substation conversion
    • an AIS to GIS 138kV substation conversion from simple bus AIS to 4 diameter, 15 breaker, breaker and a third GIS, and convert five O/H 138kV lines to U/G for termination.
    • replacement of all associated distribution infrastructure and a replacement of existing 15kV metalclad swgr with 15kV GIS and feeder re-termination

      • Relocation of four 138:15kV 30MVA transformers

  • New 2.80L and 23.80L: new 138kV 1033kcmil transmission lines through dense

    urban and industrial environments, including double circuit configurations with existing lines, navigable water crossings, and major thoroughfare crossings.

Secure Your Energy Future with Our Innovative Solutions

With our expert guidance in power transmission projects, we ensure seamless execution, regulatory compliance, and strategic coordination.